Larain Energy (HUBCO)

SOLAR, UPS and Generator Services

200kW
Capacity
Karachi, Pakistan
Location
2023
Completed
12 engineers
Team Size
Larain Energy (HUBCO)

Larain Energy (HUBCO)

SOLAR, UPS and Generator Services

Project Highlights

Comprehensive energy solution for power company
Solar, UPS, and generator integration
Grid stability enhancement
Backup power for critical operations
Advanced monitoring and control systems

Technical Specifications

Solar System: 200kW photovoltaic array
UPS System: 100kVA online UPS
Generator: 150kW diesel generator
Battery Bank: 48V 400Ah system
Control System: Advanced SCADA integration

Challenges

Complex integration of multiple power sources
Critical power requirements for energy operations
Regulatory compliance for power sector
Coordination with existing grid infrastructure

Solutions

Custom hybrid control system design
Seamless integration with existing infrastructure
Comprehensive testing and validation
Staff training and operational procedures

Results & Impact

Enhanced grid stability and reliability
Significant operational cost savings
Improved power quality and availability
Strengthened backup power capabilities

Client Testimonial

ESA

Engineer Sarah Ahmed

Operations Director

"The integrated energy solution provided by eagle power solution has significantly improved our operational efficiency. The hybrid system ensures uninterrupted power for our critical operations while reducing our energy costs."

Project Information

System Type

Hybrid System

Capacity

200kW

Location

Karachi, Pakistan

Completion Date

2023

Duration

4 months

Team Size

12 engineers

Interested in Similar Projects?

Get in touch with us to discuss your energy needs and find the perfect solution.

Ready to Start Your Project?

Let's discuss your energy needs and create a customized solution for your project.

eagle power solution Pakistan - Leading Energy Solutions Provider